Oro Loma— 20 MW Solar
Oro Loma is a 20 MW solar power plant in the United States, operated by Consolidated Edison Development Inc. and commissioned in 2017. Ranked #302 of 3,289 solar plants in the United States. Its 20 MW accounts for 0.05% of the total solar capacity of 40,823 MW in the country. The largest solar plant in the United States is the Sandstone Solar Energy Project at 2,000 MW, making Oro Loma 100 times smaller. Nearby plants within 50 km include Panoche Energy Center (432 MW, Gas), Gianelli Powerhouse (424 MW, Hydro), and W R Gianelli (424 MW, Hydro). The facility is located in California's San Joaquin Valley, approximately 90 km from Fresno.
9 years old
United States of America, North America
- 3,878. largest of 10,098 plants in United States of America
- #19,003 worldwide by installed capacity
- #2,096 of 11,042 Solar plants worldwide
9 years in operation
Solar fleet average: 10.4 years
Consolidated Edison Development Inc. operates 64 plants totalling 2,633 MW
110 plants within 100 km, 6,717 MW combined
Location
Zero Direct Emissions
Oro Loma is a solar power plant producing approximately 32 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~41 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Solar
- Energy Source
- Renewable
- Country
United States of America- Continent
- North America
- Data Source
- Global Power Plant Database
United States of America — Energy Profile
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.