Moonlight Packing - Phase 2— 1.4 MW Solar
Moonlight Packing - Phase 2 is a 1.4 MW solar power plant in the United States, operated by CalCom Energy and commissioned in 2019. Ranked #2688 of 3289 solar plants in the United States. Its 1.4 MW represents 0.0034% of the country's total solar capacity of 40,823 MW. The largest solar plant in the United States is the Sandstone Solar Energy Project at 2,000 MW, making this facility 1.43 times smaller. Nearby plants include Pine Flat (165 MW, Hydro), Haas (135 MW, Hydro), and Malaga Power LLC (121 MW, Gas). The facility is located in California's Central Valley region, approximately 40 km from Fresno.
7 years old
United States of America, North America
- 9,110. largest of 10,098 plants in United States of America
- #36,302 worldwide by installed capacity
- #9,675 of 11,042 Solar plants worldwide
7 years in operation
Solar fleet average: 10.4 years
CalCom Energy operates 2 plants totalling 3 MW
149 plants within 100 km, 6,539 MW combined
Location
Zero Direct Emissions
Moonlight Packing - Phase 2 is a solar power plant producing approximately 2 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~41 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Solar
- Energy Source
- Renewable
- Country
United States of America- Continent
- North America
- Data Source
- Global Power Plant Database
United States of America — Energy Profile
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.