Guildlerland CSG— 2 MW Solar
Guildlerland CSG is a 2 MW solar power plant in the United States, operated by Forefront Power LLC since 2019. Ranked #1986 of 3,289 solar plants in the United States. Its 2 MW represents 0.005% of the country's total solar capacity of 40,823 MW. The largest solar plant in the United States is Sandstone Solar Energy Project at 2,000 MW, making Guildlerland CSG 1,000 times smaller. Nearby plants within 50 km include Blenheim Gilboa (1,000 MW, Hydro) and Bethlehem Energy Center (893.1 MW, Gas). The facility is located in New York, approximately 40 km from the nearest major city, Albany.
7 years old
United States of America, North America
- 7,934. largest of 10,098 plants in United States of America
- #33,917 worldwide by installed capacity
- #8,552 of 11,042 Solar plants worldwide
7 years in operation
Solar fleet average: 10.4 years
Forefront Power LLC operates 21 plants totalling 44 MW
136 plants within 100 km, 7,165 MW combined
Location
Zero Direct Emissions
Guildlerland CSG is a solar power plant producing approximately 3 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~41 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Solar
- Energy Source
- Renewable
- Country
United States of America- Continent
- North America
- Data Source
- Global Power Plant Database
United States of America — Energy Profile
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.