Greene County Meter #1— 1.6 MW Solar
Greene County Meter #1 is a 1.6 MW solar power plant in the United States, operated by Tesla Inc. and commissioned in 2018. Ranked #2468 of 3289 solar plants in the United States. Its 1.6 MW represents 0.004% of the country's total solar capacity of 40,823 MW. The largest solar plant in the United States is the Sandstone Solar Energy Project at 2,000 MW, making Greene County Meter #1 1.25 times smaller. Nearby plants within 50 km include Athens Generating Plant (1221.6 MW, Gas), Blenheim Gilboa (1000 MW, Hydro), and Bethlehem Energy Center (893.1 MW, Gas). The facility is located in New York, approximately 200 km north of New York City.
8 years old
United States of America, North America
- 8,705. largest of 10,098 plants in United States of America
- #35,483 worldwide by installed capacity
- #9,326 of 11,042 Solar plants worldwide
8 years in operation
Solar fleet average: 10.4 years
Tesla Inc. operates 73 plants totalling 179 MW
149 plants within 100 km, 8,555 MW combined
Location
Zero Direct Emissions
Greene County Meter #1 is a solar power plant producing approximately 3 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~41 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Solar
- Energy Source
- Renewable
- Country
United States of America- Continent
- North America
- Data Source
- Global Power Plant Database
United States of America — Energy Profile
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.