Gavilan District College Solar Project— 1.9 MW Solar
Gavilan District College Solar Project is a 1.9 MW solar power plant in the United States, operated by Gavilan District College Solar Project and commissioned in 2019. Ranked #2328 of 3289 solar plants in the United States. Its 1.9 MW represents 0.005% of the country's total solar capacity of 40,823 MW. The largest solar plant in the United States is Sandstone Solar Energy Project at 2,000 MW, making Gavilan 1.05 times smaller. Nearby plants include Dynegy Moss Landing Power Plant Hybrid (Gas, 1398 MW), Metcalf Energy Center (Gas, 635 MW), and Los Esteros Critical Energy Center (Gas, 306.1 MW). The facility is located in California, approximately 40 km from San Jose.
7 years old
United States of America, North America
- 8,404. largest of 10,098 plants in United States of America
- #34,809 worldwide by installed capacity
- #9,023 of 11,042 Solar plants worldwide
7 years in operation
Solar fleet average: 10.4 years
Gavilan District College Solar Project operates 1 plants totalling 2 MW
134 plants within 100 km, 8,502 MW combined
Location
Zero Direct Emissions
Gavilan District College Solar Project is a solar power plant producing approximately 3 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~41 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Solar
- Energy Source
- Renewable
- Country
United States of America- Continent
- North America
- Data Source
- Global Power Plant Database
United States of America — Energy Profile
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.