Frederick County - Landfill— 2 MW Solar
Frederick County - Landfill is a 2 MW solar power plant in the United States, operated by Tesla Inc. since 2019. Ranked #1986 of 3289 solar plants in the United States. Its 2 MW represents 0.005% of the United States' total solar capacity of 40,823 MW. The largest solar plant in the United States is Sandstone Solar Energy Project at 2,000 MW, making Frederick County - Landfill 1,000 times smaller. Nearby plants include Dickerson (933 MW, Coal), Stonewall (812 MW, Gas), and Dickerson Generating Station (326 MW, Gas). The facility is located in Virginia, approximately 50 km northwest of Washington, D.C.
7 years old
United States of America, North America
- 7,934. largest of 10,098 plants in United States of America
- #33,917 worldwide by installed capacity
- #8,552 of 11,042 Solar plants worldwide
7 years in operation
Solar fleet average: 10.4 years
Tesla Inc. operates 73 plants totalling 179 MW
138 plants within 100 km, 18,577 MW combined
Location
Zero Direct Emissions
Frederick County - Landfill is a solar power plant producing approximately 3 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~41 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Solar
- Energy Source
- Renewable
- Country
United States of America- Continent
- North America
- Data Source
- Global Power Plant Database
United States of America — Energy Profile
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.