CE Turbo LLC is an 11.5 MW geothermal power plant in the United States, operated by CalEnergy Operating Corporation since 2000. Ranked #60 of 65 geothermal plants in the United States, it accounts for 0.3% of the country's total geothermal capacity of 3,889 MW. The largest geothermal plant in the United States is Geysers Unit 5-20 at 1,163 MW, making CE Turbo LLC 101 times smaller. Nearby plants include El Centro Hybrid (388.3 MW, Gas), Solar Gen 2 Solar Facility (163.2 MW, Solar), and Imperial Solar Energy Center West (148.7 MW, Solar). The facility is located in California's Imperial Valley, approximately 10 km from El Centro.
26 years old
United States of America, North America
- Primary Fuel Type
- Geothermal
- Energy Source
- Renewable
- Country
United States of America- Continent
- North America
- Data Source
- Global Power Plant Database
Geothermal power generation harnesses the Earth's internal heat to produce electricity. This renewable energy source exploits the thermal energy stored beneath the Earth's crust, which can be accessed through geothermal power plants. These plants typically utilize steam or hot water from geothermal reservoirs to drive turbines that generate electricity. The process begins by drilling wells into geothermal reservoirs, often located in tectonically active regions, where the temperature gradient is favorable for energy extraction. The steam or hot water extracted is then channeled to turbines, converting thermal energy into mechanical energy, which is subsequently transformed into electrical energy by generators.
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.