Bladenboro Solar LLC— 4.8 MW Solar
Bladenboro Solar LLC is a 4.8 MW solar power plant in the United States, operated by Cypress Creek Renewables and commissioned in 2016. Ranked #1323 of 3289 solar plants in the United States. Its 4.8 MW represents 0.01% of the United States' total solar capacity of 40,823 MW. The largest solar plant in the United States is the Sandstone Solar Energy Project at 2,000 MW, making Bladenboro Solar LLC 416.7 times smaller. Nearby plants include W H Weatherspoon (163 MW, Oil) and Innovative Solar 46 (78.5 MW, Solar). The facility is located in North Carolina, approximately 150 km southeast of Raleigh.
10 years old
United States of America, North America
- 6,404. largest of 10,098 plants in United States of America
- #29,799 worldwide by installed capacity
- #6,910 of 11,042 Solar plants worldwide
10 years in operation
Solar fleet average: 10.4 years
Cypress Creek Renewables operates 184 plants totalling 1,378 MW
173 plants within 100 km, 9,626 MW combined
Location
Zero Direct Emissions
Bladenboro Solar LLC is a solar power plant producing approximately 8 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~41 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Solar
- Energy Source
- Renewable
- Country
United States of America- Continent
- North America
- Data Source
- Global Power Plant Database
United States of America — Energy Profile
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.