Anderson Regional Landfill is a 3.2 MW waste-to-energy power plant in the United States, operated by the South Carolina Public Service Authority since 2008. Ranked #395 of 541 waste plants in the United States. Its 3.2 MW represents 0.03% of the United States' total waste capacity of 9,769 MW. The largest waste plant in the United States is the Covington Facility at 161 MW, making Anderson Regional Landfill 50.3 times smaller. Nearby plants within 50 km include Oconee Nuclear Station (2666.7 MW, Nuclear), Oconee (2666.7 MW, Nuclear), and W S Lee (1117.9 MW, Gas). The facility is located in South Carolina, approximately 100 km southwest of Greenville.
18 years old
United States of America, North America
- 7,091. largest of 10,098 plants in United States of America
- #31,811 worldwide by installed capacity
- #642 of 1,065 Waste plants worldwide
18 years in operation
Waste fleet average: 23.1 years
South Carolina Public Service Authority operates 14 plants totalling 5,174 MW
74 plants within 100 km, 14,590 MW combined
Location
Estimates based on Waste emission factor (330 g CO₂/kWh) and capacity factor (70%). Actual emissions may vary based on operating conditions, efficiency, and fuel quality.
Technical Details
- Primary Fuel Type
- Waste
- Energy Source
- Non-Renewable
- Country
United States of America- Continent
- North America
- Data Source
- Global Power Plant Database
United States of America — Energy Profile
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.