201 Sturbridge B— 2 MW Solar
201 Sturbridge B is a 2 MW solar power plant in the United States, operated by SE Solarne2 LLC and commissioned in 2014. Ranked #1986 of 3289 solar plants in the United States. Its 2 MW represents 0.005% of the United States' total solar capacity of 40,823 MW. The largest solar plant in the United States is Sandstone Solar Energy Project at 2,000 MW, making 201 Sturbridge B 1,000 times smaller. Nearby plants include Lake Road Generating Plant (Gas, 840 MW), Stony Brook (Oil, 534.6 MW), and Millennium Power (Gas, 427.5 MW). The facility is located in Massachusetts, approximately 50 km west of Worcester.
12 years old
United States of America, North America
- 7,934. largest of 10,098 plants in United States of America
- #33,917 worldwide by installed capacity
- #8,552 of 11,042 Solar plants worldwide
12 years in operation
Solar fleet average: 10.4 years
SE Solarne2 LLC operates 1 plants totalling 2 MW
497 plants within 100 km, 23,108 MW combined
Location
Zero Direct Emissions
201 Sturbridge B is a solar power plant producing approximately 3 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~41 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Solar
- Energy Source
- Renewable
- Country
United States of America- Continent
- North America
- Data Source
- Global Power Plant Database
United States of America — Energy Profile
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.