Templeborough Biomass Power Plant- Rotherham— 42 MW Biomass
Templeborough Biomass Power Plant- Rotherham is a 42 MW biomass facility in the United Kingdom, operated by Greencoat Capital. Ranked #9 of 239 biomass plants in the United Kingdom, Templeborough's 42 MW represents 0.57% of the country's total biomass capacity of 7,396 MW. The largest biomass plant in the United Kingdom is Drax Power Station at 3,960 MW, making Templeborough 94.3 times smaller. Nearby plants include Drax Power Station (3,960 MW, Biomass), Drax (1,980 MW, Coal), and Eggborough (1,960 MW, Coal). The facility is located in South Yorkshire, approximately 50 km from Sheffield.
8 years old
United Kingdom, Europe
- 337. largest of 3,024 plants in United Kingdom
- #14,931 worldwide by installed capacity
- #262 of 1,487 Biomass plants worldwide
- 0.03% of the installed capacity of United Kingdom
8 years in operation
Biomass fleet average: 20.5 years
Greencoat Capital operates 10 plants totalling 200 MW
442 plants within 100 km, 34,850 MW combined
Location
Estimates based on Biomass emission factor (230 g CO₂/kWh) and capacity factor (65%). Actual emissions may vary based on operating conditions, efficiency, and fuel quality.
Technical Details
- Primary Fuel Type
- Biomass
- Energy Source
- Renewable
- Country
United Kingdom- Continent
- Europe
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.