Stowbridge Farm - Extension (Phase 2)— 10 MW Solar
Stowbridge Farm - Extension (Phase 2) is a 10 MW solar power plant in the United Kingdom, operated by FC Palmer and Sons. Ranked #228 of 1,175 solar plants in the United Kingdom, it accounts for 0.11% of the country's total solar capacity of 8,708 MW. The largest solar plant in the United Kingdom is Shotwick at 72 MW, making Stowbridge Farm - Extension (Phase 2) 7.2 times smaller. Nearby plants within 50 km include Spalding (880 MW, Gas), Sutton Bridge (819 MW, Gas), and Lapwing Fen 2 - BESS (250 MW, Unknown). The facility is located in Norfolk, approximately 30 km west of King's Lynn.
United Kingdom, Europe
- 1,010. largest of 3,024 plants in United Kingdom
- #23,756 worldwide by installed capacity
- #3,712 of 11,042 Solar plants worldwide
- 0.01% of the installed capacity of United Kingdom
FC Palmer and Sons operates 2 plants totalling 20 MW
467 plants within 100 km, 19,799 MW combined
Location
Zero Direct Emissions
Stowbridge Farm - Extension (Phase 2) is a solar power plant producing approximately 16 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~41 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Solar
- Energy Source
- Renewable
- Country
United Kingdom- Continent
- Europe
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.