Shelford Landfill Scheme is a 1.9 MW waste power plant in the United Kingdom, operated by Brett Waste Management Ltd. Ranked #220 of 328 waste plants in the United Kingdom, its 1.9 MW represents 0.1% of the country's total waste capacity of 1,884 MW. The largest waste plant in the United Kingdom is Runcorn EfW at 81 MW, making Shelford Landfill Scheme 42.6 times smaller. Nearby plants within 50 km include Grain CHP (1,404 MW, Cogeneration), Dungeness B Power Station (1,120 MW, Nuclear), and Dungeness B (1,050 MW, Nuclear). The facility is located in Kent, approximately 30 km from Maidstone.
United Kingdom, Europe
- 2,528. largest of 3,024 plants in United Kingdom
- #34,809 worldwide by installed capacity
- #879 of 1,065 Waste plants worldwide
Brett Waste Management Ltd operates 1 plants totalling 2 MW
234 plants within 100 km, 29,292 MW combined
Location
Estimates based on Waste emission factor (330 g CO₂/kWh) and capacity factor (70%). Actual emissions may vary based on operating conditions, efficiency, and fuel quality.
Technical Details
- Primary Fuel Type
- Waste
- Energy Source
- Non-Renewable
- Country
United Kingdom- Continent
- Europe
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.