Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD)— 2 MW Biomass
Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD) is a 2 MW biomass power plant in the United Kingdom, operated by Prosper Demulder Limited / ReFood. Ranked #134 of 239 biomass plants in the United Kingdom, it represents 0.03% of the country's total biomass capacity of 7,396 MW. The largest biomass plant in the United Kingdom is Drax Power Station at 3,960 MW, making this facility 1,980 times smaller. Nearby plants within 50 km include Drax Power Station (3,960 MW, Biomass) and West Burton (2,012 MW, Coal). The facility is located in South Yorkshire, approximately 30 km from Doncaster.
United Kingdom, Europe
- 2,423. largest of 3,024 plants in United Kingdom
- #33,917 worldwide by installed capacity
- #1,169 of 1,487 Biomass plants worldwide
Prosper Demulder Limited / ReFood operates 2 plants totalling 5 MW
403 plants within 100 km, 33,326 MW combined
Location
Estimates based on Biomass emission factor (230 g CO₂/kWh) and capacity factor (65%). Actual emissions may vary based on operating conditions, efficiency, and fuel quality.
Technical Details
- Primary Fuel Type
- Biomass
- Energy Source
- Renewable
- Country
United Kingdom- Continent
- Europe
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.