Pilsworth Quarry Landfill Scheme is a 4.1 MW waste power plant in the United Kingdom, operated by Terry Adams Ltd. The commissioning year is not specified, adding to the waste management sector's energy production. Ranked #87 of 328 waste plants in the United Kingdom, this facility accounts for 0.22% of the country's total waste capacity of 1,884 MW. The largest waste plant in the United Kingdom is Runcorn EfW at 81 MW, making Pilsworth Quarry 19.8 times smaller. Nearby plants include Carrington (900 MW, Gas), Carrington Power Station (884 MW, Gas), and Fiddlers Ferry Battery Storage (150 MW, Unknown). The facility is located in Greater Manchester, approximately 250 km northwest of London.
United Kingdom, Europe
- 1,982. largest of 3,024 plants in United Kingdom
- #30,576 worldwide by installed capacity
- #576 of 1,065 Waste plants worldwide
Terry Adams Ltd operates 1 plants totalling 4 MW
403 plants within 100 km, 33,491 MW combined
Location
Estimates based on Waste emission factor (330 g CO₂/kWh) and capacity factor (70%). Actual emissions may vary based on operating conditions, efficiency, and fuel quality.
Technical Details
- Primary Fuel Type
- Waste
- Energy Source
- Non-Renewable
- Country
United Kingdom- Continent
- Europe
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.