Offham Landfill Site Phase II is a 1.2 MW waste power plant in the United Kingdom, operated by ARC Ltd (Greenways Landfill) and Waste Recycling Group plc since its commissioning. Ranked #276 of 328 waste plants in the United Kingdom, this facility represents 0.06% of the country's total waste capacity of 1,884 MW. The largest waste plant in the United Kingdom is Runcorn EfW at 81 MW, making Offham Landfill Site Phase II 67.5 times smaller. Nearby plants within 50 km include Tilbury power stations (1788 MW, Coal), Grain CHP (1404 MW, Cogeneration), and Damhead Creek (805 MW, Gas). The facility is located in Kent, approximately 40 km east of London.
United Kingdom, Europe
- 2,773. largest of 3,024 plants in United Kingdom
- #36,836 worldwide by installed capacity
- #983 of 1,065 Waste plants worldwide
ARC Ltd (Greenways Landfill)/ Waste Recycling Group plc operates 1 plants totalling 1 MW
331 plants within 100 km, 18,516 MW combined
Location
Estimates based on Waste emission factor (330 g CO₂/kWh) and capacity factor (70%). Actual emissions may vary based on operating conditions, efficiency, and fuel quality.
Technical Details
- Primary Fuel Type
- Waste
- Energy Source
- Non-Renewable
- Country
United Kingdom- Continent
- Europe
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.