World Power Plants

Land South East Of Water Treatment Works Bridge End1.5 MW Biomass

BiomassRenewable

Land South East Of Water Treatment Works Bridge End is a 1.5 MW biomass power plant in the United Kingdom, operated by DJ AND SJ RECYCLING. Ranked #169 of 239 biomass plants in the United Kingdom, this facility represents 0.02% of the country's total biomass capacity of 7,396 MW. The largest biomass plant in the United Kingdom is Drax Power Station at 3,960 MW, making this facility 2.6 times smaller. Nearby plants within 50 km include Ray (54.4 MW, Wind), Green Rigg (36 MW, Wind), and West Durham Wind Farm (24 MW, Wind). The plant is situated in Cumbria, approximately 100 km south of Carlisle.

Capacity
1.5 MW
Commissioning Year
Owner
DJ AND SJ RECYCLING
Location
54.9733°, -2.0818°

United Kingdom, Europe

Context & rankings
  • 2,641. largest of 3,024 plants in United Kingdom
  • #35,792 worldwide by installed capacity
  • #1,268 of 1,487 Biomass plants worldwide
Operator portfolio

DJ AND SJ RECYCLING operates 1 plants totalling 2 MW

Regional density

163 plants within 100 km, 5,100 MW combined

Nearest plant: Kirkheaton (13.9 km)

Location

Coordinates:: 54.973300, -2.081800
Open in Google Maps
Carbon Footprint230 g CO₂/kWh
Annual CO₂
2.0 Kt
9 GWh/year × 230 g/kWh
Cumulative CO₂
Commissioning year unknown
Annual emissions equivalent to
427
cars per year
262
homes per year
89.3K
trees to offset

Estimates based on Biomass emission factor (230 g CO₂/kWh) and capacity factor (65%). Actual emissions may vary based on operating conditions, efficiency, and fuel quality.

Technical Details

Primary Fuel Type
Biomass
Energy Source
Renewable
Country
United Kingdom
Continent
Europe
Data Source
Global Power Plant Database

United KingdomEnergy Profile

3,024
Total Plants
155.3 GW
Total Capacity
GasWindNuclearCoal
Top Fuels

See Incorrect or Missing Data?