Higher Hatherleigh Solar Farm extension— 1.5 MW Solar
Higher Hatherleigh Solar Farm extension is a 1.5 MW solar power plant in the United Kingdom, operated by Mr. J Pertwee and commissioned in 2021. Ranked #1092 of 1175 solar plants in the United Kingdom. Its 1.5 MW represents 0.02% of the United Kingdom's total solar capacity of 8,708 MW. The largest solar plant in the United Kingdom is Shotwick at 72 MW, making Higher Hatherleigh 48 times smaller. Nearby plants within 50 km include Snarlton Farm (49.6 MW, Solar), Chickerell (45 MW, Oil), and Hawkers Hill Energy Park (20 MW, Unknown). The facility is located in Wiltshire, approximately 30 km northeast of Bath.
United Kingdom, Europe
- 2,641. largest of 3,024 plants in United Kingdom
- #35,792 worldwide by installed capacity
- #9,428 of 11,042 Solar plants worldwide
Mr J Pertwee operates 1 plants totalling 2 MW
464 plants within 100 km, 13,766 MW combined
Location
Zero Direct Emissions
Higher Hatherleigh Solar Farm extension is a solar power plant producing approximately 2 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~41 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Solar
- Energy Source
- Renewable
- Country
United Kingdom- Continent
- Europe
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.