Heathfield 'C' Landfill Scheme is a 2.2 MW waste power plant in the United Kingdom, operated by Haul Waste Limited. Ranked #172 of 328 waste plants in the United Kingdom, it accounts for 0.12% of the country's total waste capacity of 1,884 MW. The largest waste plant in the United Kingdom is Runcorn EfW at 81 MW, making Heathfield 'C' Landfill Scheme 36.8 times smaller. Nearby plants include Langage (905 MW, Gas), Langage Power Station (885 MW, Gas), and Newton Abbot power station (52.5 MW, Gas). It is located in the South West region, approximately 30 km south of Exeter.
United Kingdom, Europe
- 2,380. largest of 3,024 plants in United Kingdom
- #33,568 worldwide by installed capacity
- #807 of 1,065 Waste plants worldwide
Haul Waste Limited operates 3 plants totalling 6 MW
298 plants within 100 km, 9,317 MW combined
Location
Estimates based on Waste emission factor (330 g CO₂/kWh) and capacity factor (70%). Actual emissions may vary based on operating conditions, efficiency, and fuel quality.
Technical Details
- Primary Fuel Type
- Waste
- Energy Source
- Non-Renewable
- Country
United Kingdom- Continent
- Europe
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.