World Power Plants

Heathfield 'C' Landfill Scheme2.2 MW Waste

Waste

Heathfield 'C' Landfill Scheme is a 2.2 MW waste power plant in the United Kingdom, operated by Haul Waste Limited. Ranked #172 of 328 waste plants in the United Kingdom, it accounts for 0.12% of the country's total waste capacity of 1,884 MW. The largest waste plant in the United Kingdom is Runcorn EfW at 81 MW, making Heathfield 'C' Landfill Scheme 36.8 times smaller. Nearby plants include Langage (905 MW, Gas), Langage Power Station (885 MW, Gas), and Newton Abbot power station (52.5 MW, Gas). It is located in the South West region, approximately 30 km south of Exeter.

Capacity
2.2 MW
Commissioning Year
Owner
Haul Waste Limited
Location
50.5744°, -3.6099°

United Kingdom, Europe

Context & rankings
  • 2,380. largest of 3,024 plants in United Kingdom
  • #33,568 worldwide by installed capacity
  • #807 of 1,065 Waste plants worldwide
Operator portfolio

Haul Waste Limited operates 3 plants totalling 6 MW

Regional density

298 plants within 100 km, 9,317 MW combined

Nearest plant: Newton Abbot power station (4.6 km)

Location

Coordinates:: 50.574400, -3.609900
Open in Google Maps
Carbon Footprint330 g CO₂/kWh
Annual CO₂
4.5 Kt
13 GWh/year × 330 g/kWh
Cumulative CO₂
Commissioning year unknown
Est. Retirement
Commissioning year unknown
Annual emissions equivalent to
968
cars per year
594
homes per year
202.4K
trees to offset

Estimates based on Waste emission factor (330 g CO₂/kWh) and capacity factor (70%). Actual emissions may vary based on operating conditions, efficiency, and fuel quality.

Technical Details

Primary Fuel Type
Waste
Energy Source
Non-Renewable
Country
United Kingdom
Continent
Europe
Data Source
Global Power Plant Database

United KingdomEnergy Profile

3,024
Total Plants
155.3 GW
Total Capacity
GasWindNuclearCoal
Top Fuels

See Incorrect or Missing Data?

Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.