World Power Plants

Greengairs Landfill Scheme Phase III2 MW Waste

Waste

Greengairs Landfill Scheme Phase III is a 2 MW waste power plant in the United Kingdom, operated by Waste Recycling Group. Ranked #189 of 328 waste plants in the United Kingdom, it accounts for 0.11% of the country's total waste capacity of 1,884 MW. The largest waste plant in the United Kingdom is Runcorn EfW at 81 MW, making Greengairs Landfill Scheme Phase III 40.5 times smaller. Nearby plants include Whitelee Wind Farm (539 MW, Wind), Whitelee (322 MW, Wind), and Whitelee 2 (217.02 MW, Wind). The facility is located in North Lanarkshire, approximately 25 km southeast of Glasgow.

Capacity
2 MW
Commissioning Year
Owner
Waste Recycling Group
Location
55.9050°, -3.9450°

United Kingdom, Europe

Context & rankings
  • 2,423. largest of 3,024 plants in United Kingdom
  • #33,917 worldwide by installed capacity
  • #836 of 1,065 Waste plants worldwide
Operator portfolio

Waste Recycling Group operates 45 plants totalling 138 MW

Regional density

255 plants within 100 km, 9,066 MW combined

Nearest plant: Greendykeside (2.7 km)

Location

Coordinates:: 55.905000, -3.945000
Open in Google Maps
Carbon Footprint330 g CO₂/kWh
Annual CO₂
4.0 Kt
12 GWh/year × 330 g/kWh
Cumulative CO₂
Commissioning year unknown
Est. Retirement
Commissioning year unknown
Annual emissions equivalent to
880
cars per year
540
homes per year
184.0K
trees to offset

Estimates based on Waste emission factor (330 g CO₂/kWh) and capacity factor (70%). Actual emissions may vary based on operating conditions, efficiency, and fuel quality.

Technical Details

Primary Fuel Type
Waste
Energy Source
Non-Renewable
Country
United Kingdom
Continent
Europe
Data Source
Global Power Plant Database

United KingdomEnergy Profile

3,024
Total Plants
155.3 GW
Total Capacity
GasWindNuclearCoal
Top Fuels

See Incorrect or Missing Data?

Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.