Greengairs Landfill Scheme Phase II is a 1.9 MW waste power plant in the United Kingdom, operated by Waste Recycling Group. Ranked #220 of 328 waste plants in the United Kingdom, this plant accounts for 0.1% of the country's total waste capacity of 1,884 MW. The largest waste plant in the United Kingdom is Runcorn EfW at 81 MW, making Greengairs Landfill Scheme Phase II 42.6 times smaller. Nearby plants within 50 km include Whitelee Wind Farm (539 MW, Wind), Whitelee (322 MW, Wind), and Whitelee 2 (217.02 MW, Wind). The facility is located in Scotland, approximately 25 km from Glasgow.
United Kingdom, Europe
- 2,528. largest of 3,024 plants in United Kingdom
- #34,809 worldwide by installed capacity
- #879 of 1,065 Waste plants worldwide
Waste Recycling Group operates 45 plants totalling 138 MW
255 plants within 100 km, 9,066 MW combined
Location
Estimates based on Waste emission factor (330 g CO₂/kWh) and capacity factor (70%). Actual emissions may vary based on operating conditions, efficiency, and fuel quality.
Technical Details
- Primary Fuel Type
- Waste
- Energy Source
- Non-Renewable
- Country
United Kingdom- Continent
- Europe
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.