Glenconway 2 (formerly Altahullion Phase III)— 27.6 MW Wind
Glenconway 2 (formerly Altahullion Phase III) is a 27.6 MW wind power plant in the United Kingdom, operated by Scottish and Southern Energy (SSE). Ranked #188 of 819 wind plants in the United Kingdom. Its 27.6 MW accounts for 0.09% of the United Kingdom's total wind capacity of 30,806 MW. The largest wind plant in the United Kingdom is Hornsea 1 - Heron & Njord at 1,200 MW, making Glenconway 2 43.5 times smaller. Nearby plants include Coolkeeragh (408 MW, Gas), Coolkeeragh Power Station (400 MW, Gas), and Slieve Kirk (73.6 MW, Wind). The facility is located in Northern Ireland, approximately 60 km northwest of Derry.
United Kingdom, Europe
- 475. largest of 3,024 plants in United Kingdom
- #17,311 worldwide by installed capacity
- #2,770 of 5,731 Wind plants worldwide
- 0.02% of the installed capacity of United Kingdom
Scottish and Southern Energy (SSE) operates 50 plants totalling 1,536 MW
125 plants within 100 km, 5,546 MW combined
Location
Zero Direct Emissions
Glenconway 2 (formerly Altahullion Phase III) is a wind power plant producing approximately 73 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~11 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Wind
- Energy Source
- Renewable
- Country
United Kingdom- Continent
- Europe
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.