As the 156th largest power generation facility in the United Kingdom, Fallago Rig stands out with its 144 MW capacity, harnessed from wind energy. Managed by EDF Energy Renewables, this facility reflects the UK's commitment to renewable energy, contributing to a national capacity of 153,520 MW across 3024 plants, with gas being the dominant fuel. Fallago Rig represents approximately 0.09% of the country's total capacity, underscoring the increasing reliance on wind as part of the energy mix. Situated in an area that boasts a diverse set of energy generation facilities, Fallago Rig is in proximity to notable plants such as the Torness Nuclear Power Station, which has a substantial capacity of 1364 MW, and various wind farms like Crystal Rig, which together highlight the region's commitment to a balanced energy portfolio. The presence of these nearby plants not only enhances the local energy cluster but also positions Fallago Rig as a key player in stabilizing the grid, particularly during times when wind generation is at its peak. As the UK transitions towards a greener energy future, the role of wind power facilities like Fallago Rig becomes even more crucial in mitigating climate change and reducing carbon emissions. The strategic integration of wind energy into the national grid is essential for achieving the UK's climate targets. Since its commissioning, Fallago Rig has been at the forefront of this transformation, contributing significantly to the shift away from fossil fuels. In light of the growing demand for sustainable energy solutions, Fallago Rig's operational capacity and location signify its importance in supporting the UK’s ambitious renewable energy goals while contributing to a more resilient and adaptable energy system.
13 years old
United Kingdom, Europe
- 155. largest of 3,024 plants in United Kingdom
- #8,611 worldwide by installed capacity
- #525 of 5,731 Wind plants worldwide
- 0.09% of the installed capacity of United Kingdom
13 years in operation
Wind fleet average: 14.4 years
EDF Energy Renewables operates 6 plants totalling 292 MW
178 plants within 100 km, 6,320 MW combined
Location
Zero Direct Emissions
Fallago Rig is a wind power plant producing approximately 378 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~11 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Wind
- Energy Source
- Renewable
- Country
United Kingdom- Continent
- Europe
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.