Chapel Lane Parley Solar Farm Phase 3— 4 MW Solar
Chapel Lane Parley Solar Farm Phase 3 is a 4 MW solar power plant in the United Kingdom, operated by Eco Sustainable Solutions. Ranked #889 of 1175 solar plants in the United Kingdom, this facility represents 0.05% of the country's total solar capacity of 8,708 MW. The largest solar plant in the United Kingdom is Shotwick at 72 MW, making Chapel Lane Parley 18 times smaller. Nearby plants within 50 km include Marchwood (842 MW, Gas), Nursling Battery (50 MW, Unknown), and Eveley (49.328 MW, Solar). The plant is located in England, approximately 10 km from Bournemouth.
United Kingdom, Europe
- 1,999. largest of 3,024 plants in United Kingdom
- #30,667 worldwide by installed capacity
- #7,306 of 11,042 Solar plants worldwide
Eco Sustainable Solutions operates 4 plants totalling 44 MW
358 plants within 100 km, 8,424 MW combined
Location
Zero Direct Emissions
Chapel Lane Parley Solar Farm Phase 3 is a solar power plant producing approximately 6 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~41 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Solar
- Energy Source
- Renewable
- Country
United Kingdom- Continent
- Europe
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.