BROWNIELEYS - 3 WIND TURBINES— 7.5 MW Wind
BROWNIELEYS - 3 WIND TURBINES is a 7.5 MW wind power plant in the United Kingdom, operated by Brownieleys Renewables/Muirden Energy. Ranked #484 of 819 wind plants in the United Kingdom, this facility constitutes 0.02% of the country's total wind capacity of 30,806 MW. The largest wind plant in the United Kingdom is Hornsea 1 - Heron & Njord at 1,200 MW, making BROWNIELEYS 160 times smaller. Nearby plants include European Offshore Wind Deployment Centre (93.2 MW, Wind), Mid Hill (75.9 MW, Wind), and Mid Hill I (57.5 MW, Wind). The facility is located in Scotland, approximately 30 km northeast of Dundee.
United Kingdom, Europe
- 1,231. largest of 3,024 plants in United Kingdom
- #26,300 worldwide by installed capacity
- #4,544 of 5,731 Wind plants worldwide
Brownieleys Renewables/Muirden Energy operates 1 plants totalling 8 MW
133 plants within 100 km, 7,878 MW combined
Nearest plant: Easter Tulloch Wind Farm (Tullo Extension) (1.1 km)
Location
Zero Direct Emissions
BROWNIELEYS - 3 WIND TURBINES is a wind power plant producing approximately 20 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~11 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Wind
- Energy Source
- Renewable
- Country
United Kingdom- Continent
- Europe
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.