World Power Plants

Beddingham 'B' Landfill Scheme7.5 MW Waste

Waste

Beddingham 'B' Landfill Scheme is a 7.5 MW waste power plant in the United Kingdom, operated by Haul Waste Disposal Ltd. Ranked #58 of 328 waste plants in the United Kingdom, this facility represents 0.4% of the country's total waste capacity of 1,884 MW. The largest waste plant in the United Kingdom is Runcorn EfW at 81 MW, making Beddingham 'B' 10.8 times smaller. Nearby plants include Shoreham (420 MW, Gas), Rampion Offshore Wind Farm (400 MW, Wind), and Allington EFW (51 MW, Waste). The facility is located in East Sussex, approximately 10 km north of Brighton.

Capacity
7.5 MW
Commissioning Year
Owner
Haul Waste Disposal Ltd
Location
50.8490°, 0.0513°

United Kingdom, Europe

Context & rankings
  • 1,231. largest of 3,024 plants in United Kingdom
  • #26,300 worldwide by installed capacity
  • #423 of 1,065 Waste plants worldwide
Operator portfolio

Haul Waste Disposal Ltd operates 4 plants totalling 19 MW

Regional density

259 plants within 100 km, 14,587 MW combined

Nearest plant: Laughton Level (5.3 km)

Location

Coordinates:: 50.849000, 0.051300
Open in Google Maps
Carbon Footprint330 g CO₂/kWh
Annual CO₂
15.2 Kt
46 GWh/year × 330 g/kWh
Cumulative CO₂
Commissioning year unknown
Est. Retirement
Commissioning year unknown
Annual emissions equivalent to
3.3K
cars per year
2.0K
homes per year
689.9K
trees to offset

Estimates based on Waste emission factor (330 g CO₂/kWh) and capacity factor (70%). Actual emissions may vary based on operating conditions, efficiency, and fuel quality.

Technical Details

Primary Fuel Type
Waste
Energy Source
Non-Renewable
Country
United Kingdom
Continent
Europe
Data Source
Global Power Plant Database

United KingdomEnergy Profile

3,024
Total Plants
155.3 GW
Total Capacity
GasWindNuclearCoal
Top Fuels

See Incorrect or Missing Data?