Barkip Landfill Site is a 1.2 MW waste power plant in the United Kingdom, operated by William Tracey Ltd since its commissioning. Ranked #276 of 328 waste plants in the United Kingdom, this facility contributes 0.06% of the country's total waste capacity of 1,884 MW. The largest waste plant in the United Kingdom is Runcorn EfW at 81 MW, making Barkip Landfill Site 67.5 times smaller. Nearby plants include Hunterston B (965 MW, Nuclear) and Whitelee Wind Farm (539 MW, Wind). The facility is located in North Ayrshire, approximately 40 km southwest of Glasgow.
United Kingdom, Europe
- 2,773. largest of 3,024 plants in United Kingdom
- #36,836 worldwide by installed capacity
- #983 of 1,065 Waste plants worldwide
William Tracey Ltd operates 1 plants totalling 1 MW
208 plants within 100 km, 8,298 MW combined
Nearest plant: Millour Hill Community Windfarm (Re-submission) (3.8 km)
Location
Estimates based on Waste emission factor (330 g CO₂/kWh) and capacity factor (70%). Actual emissions may vary based on operating conditions, efficiency, and fuel quality.
Technical Details
- Primary Fuel Type
- Waste
- Energy Source
- Non-Renewable
- Country
United Kingdom- Continent
- Europe
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.