Bad a Cheo Wind Farm is a 26.7 MW wind power plant in the United Kingdom, operated by Innogy. Ranked #196 of 819 wind plants in the United Kingdom. Its 26.7 MW represents 0.09% of the United Kingdom's 30,806 MW total wind capacity. The largest wind plant in the United Kingdom is Hornsea 1 - Heron & Njord at 1,200 MW, making Bad a Cheo 44.9 times smaller. Within 50 km, the nearest plants are Beatrice Wind Farm (588 MW, Wind), Baillie (52.5 MW, Wind), and Camster (50 MW, Wind). The facility is located in Scotland, approximately 200 km north of Inverness.
United Kingdom, Europe
- 487. largest of 3,024 plants in United Kingdom
- #17,458 worldwide by installed capacity
- #2,828 of 5,731 Wind plants worldwide
- 0.02% of the installed capacity of United Kingdom
Innogy operates 4 plants totalling 69 MW
74 plants within 100 km, 3,309 MW combined
Location
Zero Direct Emissions
Bad a Cheo Wind Farm is a wind power plant producing approximately 70 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~11 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Wind
- Energy Source
- Renewable
- Country
United Kingdom- Continent
- Europe
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.