Within the United Arab Emirates, the Zawra power generation facility ranks as the 50th largest among 81 plants, with a capacity of 200 MW. This relatively modest ranking highlights the challenges and opportunities in a nation where natural gas is the predominant fuel, accounting for a significant portion of the country’s energy profile. Zawra’s contribution of 0.21% to the national capacity of 97,291 MW reflects its role in supporting the UAE's energy needs, even as the country explores diverse energy sources. Commissioned in 1980 and operated by FEWA, Zawra employs gas as its primary fuel, with oil serving as a secondary source. This dual-fuel capability is crucial in a region where energy demands can fluctuate, allowing for greater operational flexibility. The facility’s long-standing presence in the UAE’s energy landscape underscores the importance of reliable power generation in supporting both residential and industrial growth. Zawra is located in a region characterized by a concentration of large gas power plants, including the nearby Jebel Ali Power and Desalination Plant, which boasts a capacity of 8694.1 MW. This proximity to other large-scale facilities, such as the Emirates Global Aluminium Jebel Ali power plant and multiple gas plants, emphasizes the cluster effect in the area, where gas dominates energy generation. The aggregation of these facilities showcases a robust energy infrastructure that is vital for meeting the UAE's growing energy demands in a rapidly developing economy. As part of the national energy profile, the UAE relies heavily on gas, which constitutes the backbone of its energy system. Zawra’s role, while smaller in comparison to larger facilities, highlights the importance of each plant in maintaining grid stability and reliability. The continued reliance on gas and oil underscores the need for transitioning towards more sustainable sources of energy, as the country aims to diversify its energy mix in line with future environmental goals. Looking ahead, Zawra is positioned within a dynamic energy landscape that is gradually shifting towards renewable sources. As the UAE continues to invest in solar and wind energy initiatives, the role of existing gas plants like Zawra will be critical in providing a stable energy supply during this transition. The facility’s operational history and ongoing relevance underscore its significance in the broader context of the UAE’s energy future.
46 years old
United Arab Emirates, Asia
- 50. largest of 81 plants in United Arab Emirates
- #7,393 worldwide by installed capacity
- #2,650 of 5,146 Natural Gas plants worldwide
- 0.21% of the installed capacity of United Arab Emirates
46 years in operation
Natural Gas fleet average: 26.9 years
FEWA operates 2 plants totalling 316 MW
45 plants within 100 km, 50,803 MW combined
Source: Arab Union of Electricity
Location
Estimates based on Gas emission factor (490 g CO₂/kWh) and capacity factor (45%). Actual emissions may vary based on operating conditions, efficiency, and fuel quality.
Technical Details
- Primary Fuel Type
- Gas
- Energy Source
- Non-Renewable
- Country
United Arab Emirates- Continent
- Asia
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.