Madinat Zayed Power Station is a gas-fired power plant in the United Arab Emirates with a capacity of 108.5 MW, operated by Al Mirfa Power Company. This facility is part of the UAE's energy infrastructure. Ranked as the 47th largest gas plant in the UAE, it represents 0.14% of the country’s total gas capacity of 78,266 MW. The UAE has 52 gas plants with a combined capacity of 78,266 MW. In comparison to the largest gas plant, محطة كهرباء جبل علي at 9,547 MW, Madinat Zayed is about 1/88th the size. Natural gas is the primary fuel source for electricity generation in the UAE, accounting for approximately 95% of the country's power generation. The UAE's strategic location and abundant natural gas reserves support its energy needs. The plant is situated in the western region of Abu Dhabi, approximately 150 km from the capital city.
16 years old
United Arab Emirates, Asia
- Primary Fuel Type
- Gas
- Energy Source
- Non-Renewable
- Country
United Arab Emirates- Continent
- Asia
- Data Source
- Global Power Plant Database
Gas power generation is a significant component of the global energy landscape, characterized by the use of natural gas to produce electricity. This process typically involves either gas turbines or combined cycle gas plants. In a gas turbine, compressed air is mixed with natural gas and ignited, producing high-temperature exhaust gases that spin a turbine connected to a generator. Combined cycle plants enhance efficiency by utilizing both gas and steam turbines. After the gas turbine generates electricity, the waste heat is used to produce steam, which drives a steam turbine, thereby maximizing energy extraction from the fuel.
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.