Kavşak Bendi ve HES— 191.28 MW Hydroelectric
Kavşak Bendi ve HES stands out as the 105th largest power generation facility in Turkey, showcasing a hydroelectric capacity of 191.28 MW. This facility accounts for approximately 0.20% of Turkey's total energy capacity of 94,534 MW, where gas remains the dominant fuel source. The significance of Kavşak Bendi ve HES is amplified when considering its proximity to other hydroelectric plants in the region. Just within 50 km, the Yedigöze Sanibey Hidroelektrik Santrali and Yedigöze Dam contribute 310.66 MW and 310 MW, respectively, marking a strong presence of hydro generation in the area. The proximity of these plants creates a valuable hydroelectric cluster that enhances the reliability and capacity of the local grid. In contrast, the Kavşak Bendi ve HES, while ranking as the 30th largest hydro facility out of 139 hydro plants in Turkey, plays a crucial role in balancing the energy mix, especially as the country continues to explore sustainable energy sources. Turkey's energy profile, with its 368 total plants, underscores a significant reliance on gas; however, the increasing emphasis on hydroelectric power is indicative of a broader trend towards diversification. The facility is owned and operated by Enerjİsa Enerjİ Üretİm Anonİm Şİrketİ, and its operational timeline reflects a commitment to renewable energy, aligning with national goals for sustainability. As Turkey moves towards a greener future, the role of Kavşak Bendi ve HES will likely become even more critical, potentially leading to enhanced environmental benefits and economic opportunities within the region.
16 years old
Turkey, Asia
- 105. largest of 368 plants in Turkey
- #7,638 worldwide by installed capacity
- #1,511 of 8,493 Hydroelectric plants worldwide
- 0.2% of the installed capacity of Turkey
16 years in operation
Hydroelectric fleet average: 42.1 years
Enerjİsa Enerjİ Üretİm Anonİm Şİrketİ operates 1 plants totalling 191 MW
28 plants within 100 km, 8,222 MW combined
Source: OpenStreetMap
Location
Zero Direct Emissions
Kavşak Bendi ve HES is a hydro power plant producing approximately 670 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~24 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Hydro
- Energy Source
- Renewable
- Country
Turkey- Continent
- Asia
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.