World Power Plants

Galip Hoca Germencik Jeotermal Enerji Santrali47.4 MW Geothermal

GeothermalRenewableVerified: Feb 2026

Galip Hoca Germencik Jeotermal Enerji Santrali is a 47.4 MW geothermal power plant in Turkey, operated by Güriş Holding. Ranked #4 of 13 geothermal plants in Turkey, this plant's 47.4 MW capacity accounts for 8.87% of Turkey's total geothermal capacity of 534 MW. The largest geothermal plant in Turkey is Efeler at 114 MW, making Galip Hoca Germencik 2.4 times smaller. Nearby plants within 50 km include Efeler (114 MW, Geothermal), Galip Hoca Germencik (47 MW, Geothermal), and Dora 3 (34 MW, Geothermal). The facility is located in Aydın Province, approximately 100 km from İzmir.

Capacity
47.4 MW
Commissioning Year
Owner
Güriş Holding
Location
37.8844°, 27.6308°

Turkey, Asia

Context & rankings
  • 182. largest of 368 plants in Turkey
  • #14,495 worldwide by installed capacity
  • #91 of 215 Geothermal plants worldwide
  • 0.05% of the installed capacity of Turkey
Operator portfolio

Güriş Holding operates 3 plants totalling 208 MW

Regional density

26 plants within 100 km, 4,042 MW combined

Nearest plant: Efeler (2.5 km)

Data provenance

Location

Coordinates:: 37.884432, 27.630825
Open in Google Maps
Carbon Footprint

Zero Direct Emissions

Galip Hoca Germencik Jeotermal Enerji Santrali is a geothermal power plant producing approximately 332 GWh of clean electricity per year with zero direct CO₂ emissions during operation.

Lifecycle emissions: ~38 g CO₂/kWh (manufacturing, transport, decommissioning)

Technical Details

Primary Fuel Type
Geothermal
Energy Source
Renewable
Country
Turkey
Continent
Asia
Data Source
Global Power Plant Database

TurkeyEnergy Profile

368
Total Plants
94.5 GW
Total Capacity
GasCoalHydroNuclear
Top Fuels

See Incorrect or Missing Data?

Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.