Galip Hoca Germencik Jeotermal Enerji Santrali— 47.4 MW Geothermal
Galip Hoca Germencik Jeotermal Enerji Santrali is a 47.4 MW geothermal power plant in Turkey, operated by Güriş Holding. Ranked #4 of 13 geothermal plants in Turkey, this plant's 47.4 MW capacity accounts for 8.87% of Turkey's total geothermal capacity of 534 MW. The largest geothermal plant in Turkey is Efeler at 114 MW, making Galip Hoca Germencik 2.4 times smaller. Nearby plants within 50 km include Efeler (114 MW, Geothermal), Galip Hoca Germencik (47 MW, Geothermal), and Dora 3 (34 MW, Geothermal). The facility is located in Aydın Province, approximately 100 km from İzmir.
Turkey, Asia
- 182. largest of 368 plants in Turkey
- #14,495 worldwide by installed capacity
- #91 of 215 Geothermal plants worldwide
- 0.05% of the installed capacity of Turkey
Güriş Holding operates 3 plants totalling 208 MW
26 plants within 100 km, 4,042 MW combined
Source: OpenStreetMap
Location
Zero Direct Emissions
Galip Hoca Germencik Jeotermal Enerji Santrali is a geothermal power plant producing approximately 332 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~38 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Geothermal
- Energy Source
- Renewable
- Country
Turkey- Continent
- Asia
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.