Merowe1,250 MW Hydroelectric

HydroRenewable

The Merowe Hydro Power Plant is a landmark energy generation facility in Sudan, generating an impressive 1250 MW from the power of the Nile River. Situated at coordinates 18.6667, 32.0500, this hydroelectric plant plays a crucial role in Sudan's energy mix, providing a substantial portion of the electricity needed to support both urban and rural areas across the country. The Merowe plant utilizes a dam-based hydroelectric generation technology, which not only helps in the production of clean energy but also contributes to flood control and irrigation management in the region. As one of the largest hydroelectric projects in Africa, it significantly enhances the stability of the local grid, enabling Sudan to meet its energy demands and reduce reliance on fossil fuels. The construction of the Merowe Power Plant aligns with Sudan's broader energy policy goals, which emphasize the development of renewable energy resources to ensure sustainable growth. The plant's output is vital in supporting economic development, particularly in agriculture and manufacturing, and it fosters energy access for millions of Sudanese citizens. With its capacity to harness renewable water resources, the Merowe Power Plant not only serves local needs but also positions Sudan as a potential energy exporter in the region, contributing to a more integrated African energy market.

Capacity
1,250 MW

1.25 GW

Commissioning Year
2009

17 years old

Owner
Sudan Electricity Transmission Company
Location
18.6667°, 32.0500°

Sudan, Africa

Context & rankings
  • 1. largest of 18 plants in Sudan
  • #1,763 worldwide by installed capacity
  • #222 of 8,493 Hydroelectric plants worldwide
  • 44.92% of the installed capacity of Sudan
Age & fleet comparison

17 years in operation

Hydroelectric fleet average: 42.1 years

Operator portfolio

Sudan Electricity Transmission Company operates 3 plants totalling 1,495 MW

Data provenance

Location

Coordinates:: 18.666700, 32.050000
Open in Google Maps
Carbon Footprint

Zero Direct Emissions

Merowe is a hydro power plant producing approximately 4380 GWh of clean electricity per year with zero direct CO₂ emissions during operation.

Lifecycle emissions: ~24 g CO₂/kWh (manufacturing, transport, decommissioning)

Technical Details

Primary Fuel Type
Hydro
Energy Source
Renewable
Country
Sudan
Continent
Africa
Data Source
Global Power Plant Database

Merowe Dam: A Keystone of Sudan's Energy Sector

The Merowe Dam, located on the Nile River in Sudan, is a significant hydroelectric power plant with a total capacity of 1250 megawatts (MW). Completed in 2009, it plays a crucial role in Sudan's energy sector by providing a substantial portion of the country's electricity supply. The dam is not only pivotal for meeting the growing energy demands of Sudan's population but also enhances the reliability of the national grid. With the escalating need for sustainable energy solutions, the Merowe Dam represents a key step towards reducing dependence on fossil fuels and advancing the use of renewable energy sources in the region.

The Merowe Dam harnesses the kinetic energy of flowing water to generate electricity, utilizing hydroelectric technology that converts the potential energy of water stored in its reservoir into electrical power. This process involves the movement of water through turbines, which then drive generators to produce electricity. The dam's design includes a reservoir that can hold significant amounts of water, allowing for regulated water flow and energy generation even during periods of low water availability in the Nile. The facility is equipped with several turbines, each contributing to the overall output, and is designed to optimize efficiency and minimize operational downtime.

In terms of environmental impact, the construction of the Merowe Dam has been a subject of considerable debate. While hydroelectric power is generally considered a cleaner alternative to fossil fuels, the dam's creation led to the displacement of local communities and affected the surrounding ecosystems. The flooding of land for the reservoir has altered habitats and impacted local wildlife, raising concerns about biodiversity loss. Additionally, the dam’s operation can influence downstream water availability, affecting agriculture and livelihoods in other regions along the Nile. Nevertheless, the Merowe Dam also has the potential to mitigate some environmental impacts by reducing greenhouse gas emissions associated with traditional fossil fuel power plants.

Regionally, the Merowe Dam serves as a cornerstone for energy cooperation in Northeast Africa. It not only aids in stabilizing Sudan's energy supply but also has the potential to facilitate electricity exports to neighboring countries, thereby promoting regional energy integration. The dam's strategic location on the Nile River allows it to collaborate with other hydropower projects in the region, which could lead to a more robust and interconnected energy infrastructure. As Sudan continues to develop its energy sector, the Merowe Dam is likely to remain a vital asset, contributing to the country's economic growth and sustainability goals while addressing the energy needs of its populace.

SudanEnergy Profile

18
Total Plants
2.8 GW
Total Capacity
HydroOilGasBiomass
Top Fuels

See Incorrect or Missing Data?

Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.