Valtierra II is a 5.9 MW solar power plant in Spain, operated since its commissioning year is not specified. Ranked #196 of 277 solar plants in Spain. Its 5.9 MW represents 0.08% of Spain's total solar capacity of 7,280 MW. The largest solar plant in Spain is Almaraz at 2,017 MW, making Valtierra II 341 times smaller. Nearby plants include Castejón 1 and 3 Power Plant (843 MW, Gas), CASTEJON GRUPO 2 (797.41 MW, Gas), and CTCC CASTEJON GRUPO 1 (424.91 MW, Gas). The facility is located in Navarre, approximately 50 km from the city of Pamplona.
16 years old
Spain, Europe
- 845. largest of 981 plants in Spain
- #27,751 worldwide by installed capacity
- #5,469 of 11,039 Solar plants worldwide
16 years in operation
Solar fleet average: 10.4 years
Fotowatio Renewable Ventures operates 134 plants totalling 1,633 MW
94 plants within 100 km, 5,802 MW combined
Source: Wiki-Solar
Location
Zero Direct Emissions
Valtierra II is a solar power plant producing approximately 9 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~41 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Solar
- Energy Source
- Renewable
- Country
Spain- Continent
- Europe
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.