World Power PlantsWorld Power Plants

TRATAMIENTO DE PURINES15 MW Waste

Waste

TRATAMIENTO DE PURINES is a 15 MW waste power plant in Spain, operated by NEOELECTRA SC ECONERGIA NAVARRA S.L. since 2005. Ranked #7 of 14 waste plants in Spain, this plant contributes 4.04% to the country's total waste capacity of 372 MW. The largest waste plant in Spain is FUENTE ALAMO III at 75 MW, making TRATAMIENTO DE PURINES 5 times smaller. Nearby plants within 50 km include ASCO GR (1,990.5 MW, Nuclear) and MEQUINENZA 1 (322.36 MW, Hydro). The facility is located in the province of Zaragoza, approximately 100 km west of Barcelona.

Capacity
15 MW
Commissioning Year
2005

21 years old

Owner
NEOELECTRA SC ECONERGIA NAVARRA S.L.
Location
41.5667°, 0.5167°

Spain, Europe

Location
Coordinates:: 41.566700, 0.516700
Open in Google Maps
Technical Details
Primary Fuel Type
Waste
Energy Source
Non-Renewable
Country
Spain
Continent
Europe
Data Source
Global Power Plant Database
SpainEnergy Profile
981
Total Plants
122.1 GW
Total Capacity
GasHydroNuclearWind
Top Fuels
Waste as a Power Generation Energy Source: An Overview

Waste power generation, also known as waste-to-energy (WtE), is an innovative approach that transforms municipal solid waste into electricity and heat through various technological processes. As of now, there are approximately 1,068 waste power plants operating across 18 countries, boasting a total installed capacity of around 14.7 gigawatts (GW). The United States leads the way with 541 plants generating 9.8 GW, followed by the United Kingdom with 329 plants at 1.9 GW, and Germany with 66 plants producing 1.6 GW. Other notable contributors include Spain and Belgium, with 15 and 8 plants respectively, though their capacities are comparatively lower.

See Incorrect or Missing Data?

Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.