TIOXIDE EUROPE S.L. is a 10 MW gas power plant in Spain, operated by TIOXIDE EUROPE S.L. It was commissioned in 2009 and is one of 84 gas plants in the country, contributing 0.02% to Spain's total gas capacity of 48,147 MW. The largest gas plant in Spain is BESOS GRUPO 5 at 1,671 MW, making TIOXIDE EUROPE S.L. 167.1 times smaller. Ranked #81 of 84 gas plants in Spain, TIOXIDE EUROPE S.L.'s 10 MW is a small share of the national gas capacity. The largest gas facility, BESOS GRUPO 5, is 167.1 times larger than this plant. Nearby plants include PALOS DE LA FRONTERA GRUPO 1 (1,167 MW, Gas) and Christopher Columbus Power Plant (391 MW, Gas). TIOXIDE EUROPE S.L. is located in the Andalusia region, approximately 80 km from Seville.
17 years old
Spain, Europe
- 745. largest of 981 plants in Spain
- #23,753 worldwide by installed capacity
- #4,504 of 5,146 Natural Gas plants worldwide
- 0.01% of the installed capacity of Spain
17 years in operation
Natural Gas fleet average: 26.9 years
TIOXIDE EUROPE S.L. operates 1 plants totalling 10 MW
58 plants within 100 km, 4,558 MW combined
Source: Red Eléctrica de España
Location
Estimates based on Gas emission factor (490 g CO₂/kWh) and capacity factor (45%). Actual emissions may vary based on operating conditions, efficiency, and fuel quality.
Technical Details
- Primary Fuel Type
- Gas
- Energy Source
- Non-Renewable
- Country
Spain- Continent
- Europe
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.