P.E. SANTO CRISTO DE MAGALLON is a 40 MW wind power plant in Spain, commissioned in 2006. It is operated by GEOLICA MAGALLON S.L. Ranked #98 of 342 wind plants in Spain, this facility's 40 MW represents 0.36% of Spain's total wind capacity of 11,210 MW. The largest wind plant in Spain is P.E. TORRE MIRO II at 99 MW, making this facility 2.48 times smaller. Nearby plants within 50 km include Castejón 1 and 3 Power Plant (843 MW, Gas), CASTEJON GRUPO 2 (797.41 MW, Gas), and CTCC CASTEJON GRUPO 1 (424.91 MW, Gas). The facility is located in the Aragón region, approximately 90 km from the city of Zaragoza.
20 years old
Spain, Europe
- 366. largest of 981 plants in Spain
- #15,126 worldwide by installed capacity
- #2,183 of 5,731 Wind plants worldwide
- 0.03% of the installed capacity of Spain
20 years in operation
Wind fleet average: 14.4 years
GEOLICA MAGALLON S.L. operates 1 plants totalling 40 MW
98 plants within 100 km, 5,962 MW combined
Source: Red Eléctrica de España
Location
Zero Direct Emissions
P.E. SANTO CRISTO DE MAGALLON is a wind power plant producing approximately 105 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~11 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Wind
- Energy Source
- Renewable
- Country
Spain- Continent
- Europe
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.