P.E. LARRIBA - HORNILLOS (2 FASE 31/5/05) is a 32 MW wind power plant in Spain, operated by MOLINOS DEL CIDACOS S.A. It represents 0.29% of Spain's total wind capacity of 11,210 MW from 342 plants. Ranked #145 of 342 wind plants in Spain, this facility is smaller than the largest wind plant, P.E. TORRE MIRO II, which has a capacity of 99 MW, making it 3.1 times smaller. This ranking illustrates the variety of wind energy sources available in the country. Nearby plants within 50 km include Arrúbal Power Plant (785 MW, Gas), ARRUBAL GRUPO 1 (784.7 MW, Gas), and P. E. ESCURRILLO (49.5 MW, Wind). The plant is located in the La Rioja region, approximately 100 km southwest of Bilbao.
21 years old
Spain, Europe
- 424. largest of 981 plants in Spain
- #16,178 worldwide by installed capacity
- #2,400 of 5,731 Wind plants worldwide
- 0.03% of the installed capacity of Spain
21 years in operation
Wind fleet average: 14.4 years
MOLINOS DEL CIDACOS S.A. operates 2 plants totalling 78 MW
74 plants within 100 km, 5,649 MW combined
Source: Red Eléctrica de España
Location
Zero Direct Emissions
P.E. LARRIBA - HORNILLOS (2 FASE 31/5/05) is a wind power plant producing approximately 84 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~11 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Wind
- Energy Source
- Renewable
- Country
Spain- Continent
- Europe
- Data Source
- Global Power Plant Database