P.E. EL COTEREJON I is an 18 MW wind power plant in Spain, operated by PARQUE EOLICO ALTO DEL COTEREJON S.L. and commissioned in 2008. Ranked #268 of 342 wind plants in Spain. Its 18 MW represents 0.16% of Spain's total wind capacity of 11,210 MW. The largest wind plant in Spain is P.E. TORRE MIRO II at 99 MW, making P.E. EL COTEREJON I 5.5 times smaller. Nearby plants within 50 km include BURGUILLO GRUPO 1 (61.95 MW, Hydro), P. E. ESCALON (30 MW, Wind), and LAS PICADAS GRUPO 1 (24.32 MW, Hydro). The facility is located in the province of Toledo, approximately 90 km southwest of Madrid.
18 years old
Spain, Europe
- 598. largest of 981 plants in Spain
- #20,292 worldwide by installed capacity
- #3,374 of 5,731 Wind plants worldwide
- 0.01% of the installed capacity of Spain
18 years in operation
Wind fleet average: 14.4 years
PARQUE EOLICO ALTO DEL COTEREJON S.L. operates 1 plants totalling 18 MW
25 plants within 100 km, 2,226 MW combined
Source: Red Eléctrica de España
Location
Zero Direct Emissions
P.E. EL COTEREJON I is a wind power plant producing approximately 47 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~11 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Wind
- Energy Source
- Renewable
- Country
Spain- Continent
- Europe
- Data Source
- Global Power Plant Database