P.E. Canredondo I is a 28 MW wind power plant in Spain, operated by Gas Natural Fenosa Renovables S.L.U. since 2006. Ranked #185 of 342 wind plants in Spain. Its 28 MW represents 0.25% of Spain's total wind capacity of 11,210 MW. The largest wind plant in Spain is P.E. Torre Miro II at 99 MW, making this facility 3.5 times smaller. Nearby plants within 50 km include Trillo Nuclear Power Plant (1003 MW, Nuclear). The facility is located in the province of Guadalajara, approximately 130 km northeast of Madrid.
20 years old
Spain, Europe
- 470. largest of 981 plants in Spain
- #17,217 worldwide by installed capacity
- #2,747 of 5,731 Wind plants worldwide
- 0.02% of the installed capacity of Spain
20 years in operation
Wind fleet average: 14.4 years
GAS NATURAL FENOSA RENOVABLES S.L.U. operates 5 plants totalling 189 MW
31 plants within 100 km, 4,320 MW combined
Source: Red Eléctrica de España
Location
Zero Direct Emissions
P.E. CANREDONDO I is a wind power plant producing approximately 74 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~11 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Wind
- Energy Source
- Renewable
- Country
Spain- Continent
- Europe
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.