P.E. ALIJAR is a 24 MW wind power plant in Spain, operated by BECOSA EOLICO ALIJAR S.A.U. since 2005. Ranked #224 of 342 wind plants in Spain, its 24 MW represents 0.21% of Spain's total wind capacity of 11,210 MW. The largest wind plant in Spain is P.E. TORRE MIRO II at 99 MW, making P.E. ALIJAR 4.1 times smaller. Nearby plants within 50 km include ARCOS DE LA FRONTERA GRUPO 1 (1585.39 MW, Gas), Arcos de la Frontera Power Plant (1585 MW, Gas), and Valle Solar Power Station (99.8 MW, Solar). The facility is located in the province of Cádiz, approximately 50 km from Seville.
21 years old
Spain, Europe
- 525. largest of 981 plants in Spain
- #18,081 worldwide by installed capacity
- #2,968 of 5,731 Wind plants worldwide
- 0.02% of the installed capacity of Spain
21 years in operation
Wind fleet average: 14.4 years
BECOSA EOLICO ALIJAR S.A.U. operates 1 plants totalling 24 MW
79 plants within 100 km, 13,957 MW combined
Source: Red Eléctrica de España
Location
Zero Direct Emissions
P.E. ALIJAR is a wind power plant producing approximately 63 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~11 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Wind
- Energy Source
- Renewable
- Country
Spain- Continent
- Europe
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.