PARQUE EOLICO SIERRA DEL MADERO I is a 14.85 MW wind power plant in Spain, operated by PARQUE EOLICO SIERRA DEL MADERO SA. and commissioned in 2006. Ranked #300 of 342 wind plants in Spain, this facility contributes 0.13% of Spain's total wind capacity of 11,210 MW. The largest wind plant in Spain is P.E. TORRE MIRO II at 99 MW, making PARQUE EOLICO SIERRA DEL MADERO I 6.7 times smaller. Nearby plants include Castejón 1 and 3 Power Plant (843 MW, Gas), CASTEJON GRUPO 2 (797.41 MW, Gas), and CTCC CASTEJON GRUPO 1 (424.91 MW, Gas). The plant is located in Aragon, approximately 50 km from Zaragoza.
Spain, Europe
- 655. largest of 981 plants in Spain
- #21,571 worldwide by installed capacity
- #3,596 of 5,731 Wind plants worldwide
- 0.01% of the installed capacity of Spain
PARQUE EOLICO SIERRA DEL MADERO SA. operates 1 plants totalling 15 MW
99 plants within 100 km, 6,049 MW combined
Source: Red Eléctrica de España
Location
Zero Direct Emissions
PARQUE EOLICO SIERRA DEL MADERO I is a wind power plant producing approximately 39 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~11 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Wind
- Energy Source
- Renewable
- Country
Spain- Continent
- Europe
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.