PARQUE EOLICO BOIRA is a 34.5 MW wind power plant in Spain, operated by ACCIONA EOLICA DEL LEVANTE S.L. and commissioned in 2009. Ranked #132 of 342 wind plants in Spain, its 34.5 MW represents 0.31% of the country's total wind capacity of 11,210 MW. The largest wind plant in Spain is P.E. TORRE MIRO II at 99 MW, making PARQUE EOLICO BOIRA 2.9 times smaller. Nearby plants within 50 km include Castejón 1 and 3 Power Plant (843 MW, Gas), CASTEJON GRUPO 2 (797.41 MW, Gas), and CTCC CASTEJON GRUPO 1 (424.91 MW, Gas). The facility is located in the Aragon region, approximately 90 km from Zaragoza.
17 years old
Spain, Europe
- 406. largest of 981 plants in Spain
- #15,934 worldwide by installed capacity
- #2,331 of 5,731 Wind plants worldwide
- 0.03% of the installed capacity of Spain
17 years in operation
Wind fleet average: 14.4 years
ACCIONA EOLICA DEL LEVANTE S.L. operates 2 plants totalling 59 MW
100 plants within 100 km, 6,056 MW combined
Source: Red Eléctrica de España
Location
Zero Direct Emissions
PARQUE EOLICO BOIRA is a wind power plant producing approximately 91 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~11 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Wind
- Energy Source
- Renewable
- Country
Spain- Continent
- Europe
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.