PARQUE EOLICO BELCHITE is a 49.5 MW wind power plant in Spain, operated by PARQUE EOLICO BELCHITE S.L. It was commissioned in 2005 and is located at coordinates 41.3032, -0.7505. Ranked #36 of 342 wind plants in Spain. Its 49.5 MW represents 0.44% of Spain's total wind capacity of 11,210 MW. The largest wind plant in Spain is P.E. TORRE MIRO II at 99 MW, making PARQUE EOLICO BELCHITE 2 times smaller. Nearby plants include TERUEL GR 3 (1055.77 MW, Coal), ESCATRON (804.36 MW, Gas), and Escatrón Thermal Power Plant (804 MW, Gas). The facility is located in the Aragon region, approximately 90 km from Zaragoza.
21 years old
Spain, Europe
- 285. largest of 981 plants in Spain
- #13,642 worldwide by installed capacity
- #1,359 of 5,731 Wind plants worldwide
- 0.04% of the installed capacity of Spain
21 years in operation
Wind fleet average: 14.4 years
PARQUE EOLICO BELCHITE S.L. operates 1 plants totalling 50 MW
72 plants within 100 km, 7,109 MW combined
Source: Red Eléctrica de España
Location
Zero Direct Emissions
PARQUE EOLICO BELCHITE is a wind power plant producing approximately 130 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~11 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Wind
- Energy Source
- Renewable
- Country
Spain- Continent
- Europe
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.