World Power PlantsWorld Power Plants

PARQUE EOLICO BELCHITE49.5 MW Wind

WindRenewable

PARQUE EOLICO BELCHITE is a 49.5 MW wind power plant in Spain, operated by PARQUE EOLICO BELCHITE S.L. It was commissioned in 2005 and is located at coordinates 41.3032, -0.7505. Ranked #36 of 342 wind plants in Spain. Its 49.5 MW represents 0.44% of Spain's total wind capacity of 11,210 MW. The largest wind plant in Spain is P.E. TORRE MIRO II at 99 MW, making PARQUE EOLICO BELCHITE 2 times smaller. Nearby plants include TERUEL GR 3 (1055.77 MW, Coal), ESCATRON (804.36 MW, Gas), and Escatrón Thermal Power Plant (804 MW, Gas). The facility is located in the Aragon region, approximately 90 km from Zaragoza.

Capacity
49.5 MW
Commissioning Year
2005

21 years old

Owner
PARQUE EOLICO BELCHITE S.L.
Location
41.3032°, -0.7505°

Spain, Europe

Location
Coordinates:: 41.303200, -0.750500
Open in Google Maps
Technical Details
Primary Fuel Type
Wind
Energy Source
Renewable
Country
Spain
Continent
Europe
Data Source
Global Power Plant Database
SpainEnergy Profile
981
Total Plants
122.1 GW
Total Capacity
GasHydroNuclearWind
Top Fuels
Understanding Wind Power Generation: A Comprehensive Overview

Wind power generation harnesses the kinetic energy of wind to produce electricity, making it one of the fastest-growing renewable energy sources globally. This process begins with wind turbines, which consist of large blades mounted on a tower. As the wind blows, it causes the blades to rotate, transforming the wind's kinetic energy into mechanical energy. This mechanical energy is then converted into electrical energy through a generator connected to the turbine. The efficiency of wind turbines has significantly improved over the past decades, with modern designs capable of generating power even at low wind speeds.

See Incorrect or Missing Data?

Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.