PARQUE EOLICO ALTO PALANCIA III is a 94 MW wind power plant in Spain, operated by CORPORACION ACCIONA EOLICA S.L. and commissioned in 2009. Ranked #5 of 342 wind plants in Spain, it represents 0.84% of Spain's total wind capacity of 11,210 MW. The largest wind plant in Spain is P.E. DOLAR 1 at 99 MW, making PARQUE EOLICO ALTO PALANCIA III 0.95 times smaller. Nearby plants within 50 km include Central térmica de Sagunto (Gas, 1233 MW), CCC SAGUNTO GRUPO 2 (Gas, 1232.19 MW), and PARQUE EOLICO PENAS DE DIOS (Wind, 64.5 MW). The facility is located in Valencia, approximately 30 km from the city of Valencia.
17 years old
Spain, Europe
- 167. largest of 981 plants in Spain
- #10,589 worldwide by installed capacity
- #888 of 5,731 Wind plants worldwide
- 0.08% of the installed capacity of Spain
17 years in operation
Wind fleet average: 14.4 years
CORPORACION ACCIONA EOLICA S.L. operates 7 plants totalling 241 MW
49 plants within 100 km, 15,286 MW combined
Source: Red Eléctrica de España
Location
Zero Direct Emissions
PARQUE EOLICO ALTO PALANCIA III is a wind power plant producing approximately 247 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~11 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Wind
- Energy Source
- Renewable
- Country
Spain- Continent
- Europe
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.