P. E. LA GAMONEDA (AMPLIADA CON RE-1814) is a 19.8 MW wind power plant in Spain, operated by EOLICA DE SANABRIA S.L. and commissioned in 2008. Ranked #256 of 342 wind plants in Spain, this plant contributes 0.18% of Spain's total wind capacity of 11,210 MW. The largest wind plant in Spain is P.E. TORRE MIRO II at 99 MW, making this facility 5 times smaller. Nearby plants include PUENTE BIBEY 4 (312.41 MW, Hydro), Puente Bibey (284 MW, Hydro), and CONSO 2 (268.02 MW, Hydro). It is located in Castile and León, approximately 80 km from León.
Spain, Europe
- 583. largest of 981 plants in Spain
- #19,924 worldwide by installed capacity
- #3,296 of 5,731 Wind plants worldwide
- 0.02% of the installed capacity of Spain
EOLICA DE SANABRIA S.L. operates 2 plants totalling 50 MW
110 plants within 100 km, 10,828 MW combined
Source: Red Eléctrica de España
Location
Zero Direct Emissions
P. E. LA GAMONEDA (AMPLIADA CON RE-1814) is a wind power plant producing approximately 52 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~11 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Wind
- Energy Source
- Renewable
- Country
Spain- Continent
- Europe
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.