P. E. CORTIJO DE GUERRA I is a 40.8 MW wind power plant in Spain, operated by PARQUE EOLICO PUERTO REAL I S.L.U. since 2007. Ranked #90 of 342 wind plants in Spain. This plant's 40.8 MW represents 0.36% of Spain's total wind capacity of 11,210 MW. The largest wind plant in Spain is P.E. TORRE MIRO II at 99 MW, making P. E. CORTIJO DE GUERRA I 2.4 times smaller. Nearby plants within 50 km include ARCOS DE LA FRONTERA GRUPO 1 (1,585.4 MW, Gas), Arcos de la Frontera Power Plant (1,585 MW, Gas), and Valle Solar Power Station (99.8 MW, Solar). The facility is located in the province of Cádiz, approximately 40 km northeast of Cádiz city.
19 years old
Spain, Europe
- 356. largest of 981 plants in Spain
- #15,075 worldwide by installed capacity
- #2,166 of 5,731 Wind plants worldwide
- 0.03% of the installed capacity of Spain
19 years in operation
Wind fleet average: 14.4 years
PARQUE EOLICO PUERTO REAL I S.L.U. operates 1 plants totalling 41 MW
79 plants within 100 km, 13,941 MW combined
Source: Red Eléctrica de España
Location
Zero Direct Emissions
P. E. CORTIJO DE GUERRA I is a wind power plant producing approximately 107 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~11 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Wind
- Energy Source
- Renewable
- Country
Spain- Continent
- Europe
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.