LOS PEARES GRUPO 2 holds the position of the 133rd largest power generation facility in Spain, with a capacity of 181.02 MW. This hydroelectric plant, commissioned in 1954, ranks as the 37th largest among 155 hydro facilities in the country, making it an essential component of Spain's energy landscape. The facility contributes approximately 0.15% to the national capacity of 122,104 MW, underscoring its role in a market that is increasingly leaning towards gas as a dominant fuel source. Utilizing state-of-the-art hydroelectric technology, LOS PEARES GRUPO 2 converts the kinetic energy of flowing water into electricity, providing a clean and sustainable energy resource. Its strategic location is complemented by nearby plants such as San Esteban II Grupo 1, which has a much larger capacity of 438.45 MW, and BELESAR GRUPO 2, contributing 331.01 MW. This clustering of hydro plants within a 50 km radius enhances the region's ability to deliver a reliable power supply, balancing the energy grid effectively. Within Spain's energy profile, while gas leads the way, hydro remains a vital player, especially in regions like this where natural water resources are abundant. The operator, GAS NATURAL FENOSA GENERACION S.L.U., has played a significant role in maintaining and optimizing the efficiency of this facility since its inception nearly seven decades ago. As Spain continues to transition towards a more sustainable energy system, LOS PEARES GRUPO 2 exemplifies the country's commitment to renewable sources. The plant not only contributes to reducing greenhouse gas emissions but also supports local hydropower initiatives, which are crucial for environmental sustainability and energy independence.
72 years old
Spain, Europe
- 133. largest of 981 plants in Spain
- #7,760 worldwide by installed capacity
- #1,555 of 8,493 Hydroelectric plants worldwide
- 0.15% of the installed capacity of Spain
72 years in operation
Hydroelectric fleet average: 42.1 years
GAS NATURAL FENOSA GENERACION S.L.U. operates 29 plants totalling 9,916 MW
112 plants within 100 km, 8,636 MW combined
Source: Red Eléctrica de España
Location
Zero Direct Emissions
LOS PEARES GRUPO 2 is a hydro power plant producing approximately 634 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~24 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Hydro
- Energy Source
- Renewable
- Country
Spain- Continent
- Europe
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.