LES COLLADETES I is a 36.63 MW wind power plant in Spain, operated by ENERVENT S.A. since 2000. Ranked #117 of 342 wind plants in Spain, this facility's 36.63 MW represents 0.33% of Spain's total wind capacity of 11,210 MW. The largest wind plant in Spain is P.E. TORRE MIRO II at 99 MW, making LES COLLADETES I 2.7 times smaller. Nearby plants within 50 km include ASCO GR (1990.5 MW, Nuclear) and Ascó Nuclear Power Plant (1988 MW, Nuclear). The facility is located in the Catalonia region of Spain, approximately 50 km from Tarragona.
26 years old
Spain, Europe
- 387. largest of 981 plants in Spain
- #15,643 worldwide by installed capacity
- #2,278 of 5,731 Wind plants worldwide
- 0.03% of the installed capacity of Spain
26 years in operation
Wind fleet average: 14.4 years
ENERVENT S.A. operates 1 plants totalling 37 MW
37 plants within 100 km, 12,776 MW combined
Source: Red Eléctrica de España
Location
Zero Direct Emissions
LES COLLADETES I is a wind power plant producing approximately 96 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~11 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Wind
- Energy Source
- Renewable
- Country
Spain- Continent
- Europe
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.