AMPLIACION PADORNELO is an 18 MW wind power plant in Spain, operated by IBEREOLICA HEDROSO-ACIBEROS 2 S.L.U. since 2009. Ranked #268 of 342 wind plants in Spain, it represents 0.16% of the country's total wind capacity of 11,210 MW. The largest wind plant in Spain is P.E. TORRE MIRO II at 99 MW, making AMPLIACION PADORNELO 5.5 times smaller. Nearby plants within 50 km include PUENTE BIBEY 4 (312.41 MW, Hydro) and Puente Bibey hydro power plant (284 MW, Hydro). The facility is located in the province of León, approximately 120 km from the city of León.
17 years old
Spain, Europe
- 598. largest of 981 plants in Spain
- #20,289 worldwide by installed capacity
- #3,374 of 5,731 Wind plants worldwide
- 0.01% of the installed capacity of Spain
17 years in operation
Wind fleet average: 14.4 years
IBEREOLICA HEDROSO-ACIBEROS 2 S.L.U. operates 2 plants totalling 32 MW
110 plants within 100 km, 10,830 MW combined
Source: Red Eléctrica de España
Location
Zero Direct Emissions
AMPLIACION PADORNELO is a wind power plant producing approximately 47 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~11 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Wind
- Energy Source
- Renewable
- Country
Spain- Continent
- Europe
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.